Wirenet Image Band
wirenet.org mobile image band

Wire Journal News

The U.S. Department of Commerce (DoC) has imposed new duties of up to 63% on some Chinese aluminum wire and cable imports because of what was described as “price-dumping.”

Per a cited DoC statement, “(DoC) announced the affirmative preliminary determination in the antidumping duty (AD) investigation of imports of aluminum wire and cable from China, finding that exporters from China have dumped aluminum wire and cable in the United States at a margin of 58.51 to 63.47 percent."

Encore Wire Chairman, President and CEO Daniel Jones welcomed the decision, noting that, "These illegal trade practices have undermined our investments in aluminum wire production, which is an important complement to our market-leading copper wire business." 

A fact sheet accompanying the notice reported that U.S. imports of aluminum wire and cable from China were valued at more than $157 million in 2017. U.S. customs and border agents will begin collecting cash deposits from importers of these products at the same rates to offset unfair Chinese subsidies, the Commerce Department said.

The Trump administration, reports said, has initiated 168 investigations of unfair trade practices since taking office, more than double the number during a comparable period of the previous administration, according to the release.

LS Cable & System President & CEO Myung Roe-Hyun announced that the company has opened a new cable plant in Poland, its first production base in Europe.

A press release said that the plant is the first such one for a South Korean company in Europe, “the home of cable.” The plant produces parts for electric vehicle batteries and optical cables for communication. More than 100 people, including Cha-Yup Koo, chairman of LS Cable & System; Roe-Hyun; Lee Dong-Wook, CEO of LS C & S Poland; Dariusz Kucharski, mayor of Dzierzoniow; and Mira Sun, Korean ambassador to Poland, attended the ribbon-cutting ceremony.

“LS C & S is pushing ahead with its localization and regional base strategy,” Roe-Hyun said. “The Polish plant will serve as the key base for advancing into Europe, and transform the company into a total cable company by adding the power cable business.”
The release said that Poland has very roads and power grids, and the Polish government is known to fully support investment of foreign capital with various tax incentives. Also, the company said that the nation’s geographic location is favorable to export to other European countries and its excellent workforce availability are important reasons for selecting Poland.

LS C & S established a subsidiary that produces parts for electric vehicle batteries (LSEVP) in Poland in November 2017. LSEVP can produce parts for 300,000 electric vehicles annually, and is planning to increase supplies to European automakers starting with LG Chem in nearby Wroclaw at the end of this year.

LS C & S established its optical cable production subsidiary (LSCP) next to its LSEVP plant in February 2018 as the European optical cable market has grown rapidly. It is the third optical cable plant of LS C & S, following the plants it built in Gumi, Korea and Ho Chi Minh, Vietnam.

LSCP began production last April and has proven that it can produce three million fiber km a year—about 7% of the European market—and has since been supplying its products to key European carriers in Italy, France, etc. With the completion of the Polish plant, LS C & S now has a total of 19 business sites at home and abroad, including nine overseas in Vietnam, China and the U.S.


The Prysmian Group has won a contract worth approximately €200 million from Vineyard Wind, LLC, that will require a total of 134 km of power cables for a project that was described as the first U.S. utility-scale offshore wind energy project.

A press release said that Prysmian Group will be responsible for the design, manufacture, installation and commissioning of an HVAC (High Voltage Alternating Current) cable system for the project, which is located 14 miles off the coast of Massachusetts. The two, 220 kV three-core cables, which will use extruded XLPE insulation, will be produced at the Prysmian Group’s plants in Pikkala, Finland, and Arco Felice, Italy. Installation operations will be performed by two Prysmian Group cable-laying vessels: the Cable Enterprise and Ulisse. Delivery and commissioning are scheduled for 2021.

The release said that Prysmian will also provide PRY-CAM permanent monitoring solutions that include long-range Distributed Temperature Sensing (DTS) and Real Time Thermal Rating (RTTR) systems that collect and analyze data by ways of an artificial intelligence interface, which generates automated alarm signals if a critical situation is identified. “PRY-CAM is the Group’s breakthrough technology that allows on-line, accurate and reliable in-depth information to helps electric assets owners to increase uptime, asset longevity and safety, while reducing maintenance costs and risks.”

“This contract reinforces Prysmian Group’s leading position in the submarine cable market and underpins both our continued role and our commitment to the North American offshore wind sector,” the release said. Hakan Ozmen, EVP Projects, Prysmian Group, observed that the U.S. offshore wind market “is now demonstrating a high level of motivation with a promising growth forecast and we are excited to contribute to realizing this opportunity.”

The project will provide power for some 400,000 homes and businesses while reducing carbon emissions by over 1.6 million tons per year, the release said. To date, there has been just one off-shore wind farm, that the small (30 MW) Block Island Wind Farm off the coast of Rhode Island that began operation in 2016. More projects are now underway or planned, with the state of New York alone seeking to achieve 2,400 MW of offshore wind capacity by 2030.

An offshore wind development company, Vineyard Wind, LLC, is 50% owned by funds of Copenhagen Infrastructure Partners and 50% by Avangrid Renewables (part of the Iberdrola Group).

NKT has been awarded a turnkey project from Equinor Energy AS for 132 kV high-voltage cable that will connect the oil and gas platforms Johan Sverdrup 2 and Gina Krog.

 A press release said that Equinor selected NKT as the turnkey supplier for the high-voltage cable project connecting the oil and gas platforms Gina Krog and Johan Sverdrup 2 in the North Sea. The order, worth approximately 29 million euros, includes the supply and installation of 62 km of a 132 kV AC XLPE high-voltage power cable solution. Connecting the platforms allows Equinor to power Gina Krog from shore by leveraging the already planned power link connecting Johan Sverdrup 2 to the onshore power grid, currently under development by NKT.

“By connecting the two platforms we confirm our strong market position as a reliable turnkey provider of high quality cable systems in the oil and gas segment supporting the growing industry focus on reducing its CO2 emissions,” said NKT Executive Vice President and Head of HV Solutions Andreas Berthou. He noted that the company’s ability to provide the cable, and install it, using its cable laying vessel, the NKT Victoria, was “a differentiator.”

NKT is currently executing on the power cable link connecting Johan Sverdrup 2 to shore. The power from shore connections for the platforms Johan Sverdrup 1 and Martin Linge were recently completed.

Elkem, Inc., announced that it has entered into a partnership with Schlenk Metal Foils to provide RF shielding materials and conductors that are superior to traditionally used flat-rolled wire.

A press release said that there is increasing demand for shielding materials with higher flexibility, reduced thickness, greater width and extended lifetime in the high-frequency cable market, where traditionally rolled silvered copper has limitations. Partnering with Schlenk, an industry leader in rolled metal foils technology, Elkem, which provides specialized electroplating, is now able to offer advanced RF shielding based on silver-plated copper foil.

"The products created from our partnership will enable cable manufacturers to design thinner conductors with higher aspect ratios that are also more flexible and durable," said Schlenk Sales Manager Thorben Beckmann.

Elkem Inc. Vice President Jeff Lawrence said that the RF shielding materials and conductors are available now, both for R&D sample quantities and full-volume production orders. He noted that Elkem, which will exhibit at Interwire at Booth 254, is expanding its plating equipment to provide increased capacity to the market.

Contact us

The Wire Association Int.

71 Bradley Road, Suite 9

Madison, CT 06443-2662

P: (203) 453-2777