Wirenet Image Band
wirenet.org mobile image band

Wire Journal News

NEC Corporation has signed an agreement with a coalition of marque businesses to build a nearly 16,000-km-long optical submarine cable.

A press release said that NEC was selected by The Bay to Bay Express Cable System (BtoBE) coalition composed of China Mobile International, Facebook and Amazon Web Services. Its mandate is to build a high- performance submarine cable connecting Singapore, Hong Kong and the United States. “NEC is honored to be selected by the BtoBE consortium as the turnkey system supplier for this world record-breaking optical fiber submarine cable system that covers the longest distance without regeneration,” it said.

The BtoBE system, scheduled for completion by the fourth quarter of 2020, will feature “multiple pairs of optical fibre that enable high-capacity transmission of data across the Pacific Ocean with round-trip latency of less than 130 milliseconds.” It added that the BtoBE “will further enhance and contribute to the much-needed expansion of communications networks between the Guangdong-Hong Kong-Macao Bay Area, San Francisco Bay Area and Singapore.”

The cable will be built with the most advanced optical submarine transmission equipment, thereby improving network redundancy, flexibility and ensuring highly reliable communications, the release said. The BtoBE, landing at three locations spanning across the Pacific Ocean, is designed so that once completed, it can carry at least 18Tbs of capacity per fiber pair, said Toru Kawauchi, general manager of the Submarine Network Division at NEC Corporation. “The BtoBE will provide seamless connectivity and network diversity ... and complement other Asia-Pacific submarine cables, among others.”

.

The Wire Association International will stage its first-ever standalone regional edition of its long-running and content-refined Fundamentals of Wire Manufacturing course on October 10, 2018, at the Sheraton McKinney Hotel in McKinney, Texas, USA.

This concentrated introductory workshop provides a solid grounding in the essentials of wire and cable manufacturing presented by experts in the field. It is WAI’s most successful training program and refresher course for new hires, sales teams and operations personnel. The curriculum includes: mechanics of wiredrawing, drawing dies, wiredrawing lubricants, wire breaks & surface damage, stranding cable, cleaning & coating of rod & wire, extrusion, basics of electrical testing, ferrous heat treatment, used machinery, manufacturing problem solving, testing & properties and ferrous metallurgy.

“The program has become so popular in recent years that we wanted to expand it by offering it regionally too, outside of the confines of WAI’s annual show and conference,” said WAI Director of Education Marc Murray. “We know there’s a strong demand for this type of instruction, not just for new employees but for veterans brushing up on their knowledge who want to learn something new. We want to make it as easy and convenient as possible for people to get this kind of education. Moving it physically closer to the audience is an effective way to do that.”

This one-day program provides extensive instruction by 10 industry professionals and networking opportunities pertinent to the ever-evolving wire industry.

The registration fee is $195 for WAI members and $295 for nonmembers. Registration includes classroom materials and lunch. On October 11, 2018, WAI offers participants a choice of one or both plant tours to Encore Wire and Wire & Plastic Machinery Corp. at $25 each.

Click here to see the program schedule and here to register. 

.

Sampsistemi, a business of Italy’s SAMP Group, announced that it plans to expand the operations of its China-based subsidiary Sampsistemi (Shanghai) Co. Ltd.

A press release said that as a result of the recent acquisition of Setic and Pourtier—two well-known French companies that were part of the Gauder Group—Sampsistemi has decided to expand and strengthen its existing Chinese footprint. The plan is to expand the Setic plant in Changzhou with a significant investment in infrastructure, and to enlarge the production area.

The Setic plant, located in the Xinbei District, covers an area of 6,400 sq m, and it is currently dedicated to manufacturing rotating machines and related equipment for the wire and cable industry, the release said. The expansion plan will increase the manufacturing area up to 10,000 sq m, plus 2.600 sq m dedicated to office space. The unit will be equipped with state of the art assembly lines for wire and cable machinery and an enhanced R&D center with a test lab. Each space will meet the highest safety and quality standards. “The consolidation of the production capacity into one location will allow us to fully synergize the combined know-how and technologies, while providing greater value to our customers.”

“With the acquisition of Setic and Pourtier, Sampsistemi has completed a three-year strategic initiative aimed at strengthening its leading position in the market and meeting the ongoing demand for a single source-provider, capable of supporting the clients with cutting edge solutions,” said SAMP CEO Lapo Vivarelli Colonna. “The new organization will enhance our capability to provide products and services in China, the largest wire & cable market in the world.”

Sampsistemi is a company of the Maccaferri Industrial Group, an international entity active in seven main sectors, with 58 production plants, 4,600 employees worldwide and annual revenues of 1.2 billion euros.

Nexans announced that it will provide 27 km of complex umbilicals with power, fiber-optic and hydraulic elements for the next development phase of the most prolific oil and gas field on the Norwegian continental shelf.

A press release said that Phase 3 of the Troll project covers the development of the Troll West structure, which lies in water depths of approximately 330 meters and is located 25 km north-west of the Troll A platform. The contract is from Equinor ASA, a multinational energy company based in Stavanger, Norway.

Nexans Norway will design, manufacture and supply static umbilicals that include high voltage power elements, high-pressure hydraulic lines, low-pressure hydraulic lines, a MEG (methanol and glycol) service line for chemical injection, a spare line and fiber-optic communications – all within a single cross-section. A 20-km umbilical will link the Troll A platform to Template W1, while a 7-km umbilical will then link Template W1 to Template W2. The contract also includes the supply of connections, terminations and other umbilical accessories.

Nexans offered Equinor a total “made in Norway” approach to the contract with the electrical and fiber optic elements manufactured at the Nexans Norway facility in Rognan, North Norway, while the complete umbilical system will be developed, manufactured and tested at Nexans Norway plant in Halden, Norway, the release said.

“Nexans has established an impressive track record in delivering umbilical projects for the Norwegian continental shelf and we look forward to continuing our long-standing relationship with Equinor by delivering this key contract for Troll Phase 3,” said Vincent Dessale, Nexans Senior Executive Vice President Subsea and Land Systems Business Group.

Nexans is scheduled to deliver the Troll Phase 3 umbilicals in the first quarter of 2020. First gas is expected from the project in the second quarter of 2021.

NKT reports that it has won a turnkey order of two high-voltage cable systems that will provide power availability and transmission security in the regions of Hedmark and Oppland in Norway.

A press release said that the contract calls for NKT to provide turnkey delivery of two 145 kV AC (alternating current) extruded cable system sets for the Mjøsa Project in the regions Hedmark and Oppland located North of Oslo in Norway. The order, from power grid operator Eidsiva Nett AS, will upgrade the grid in the region around Lake Mjøsa. It includes a total cable length of 35 km.

“We have great experience from several projects in Norway and we are excited to play a part in the continuous development of the Norwegian power grid,” said nkt President & CEO Michael Hedegaard Lyng, who noted that it will also support the integration of renewable.

The cables are to be manufactured this year at NKT’s facility in Karlskrona, Sweden, with commissioning set for 2019, the release said. It noted that nkt has extensive experience from projects in Norway and is currently executing on orders for the cable systems bringing power from shore to the oil and gas platforms.

Contact us

The Wire Association Int.

71 Bradley Road, Suite 9

Madison, CT 06443-2662

P: (203) 453-2777